What is the grade of a site referred to after all construction work has been completed?

Prepare for the SGLA LARE IAP Exam with flashcards and multiple choice questions designed to enhance your understanding. Each question features hints and explanations. Gear up for success!

The term "grade, finished" refers to the final elevation and contours of a site after all construction work has been completed. This stage ensures that the site meets the design specifications and is ready for its intended use, whether that involves landscaping, building construction, or another purpose. At this point, any rough grading done earlier in the construction process has been refined to create smooth, even surfaces that facilitate drainage and aesthetics.

In contrast, "grade, rough" pertains to the initial shaping of the site, where the bulk earthwork has been done, but final details such as fine grading have not yet been completed. "Grade, natural" indicates the original ground levels before any construction has taken place, and "grade, preliminary" implies an early design stage where initial assessments or rough drafts of grading plans are made. Thus, "grade, finished" is specifically the correct term for the condition of the site once all work is finalized.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy